Signs
From the supply and installation of a single sign or bollard to the delivery of a fully commissioned managed motorway system; the experience and quality of our integrated in-house team will ensure we offer the most efficient and cost effective signage solution.
Project showcase
Hampshire NMIS MBU Phases 3 and 8 – Portsmouth.
The M3, A (3)M and A27 represent a critical part of the countries highway network connecting not only the cities of.. read more
M1 Junction 21, Traffic Flow Improvements
This scheme to improve road user safety and add capacity to this busy junction involved widening the motorway.. read more
A1 Peterborough to Blyth Grade Separated Junctions
The A1 Trunk road is a north – south regional route of strategic importance, connecting the two sections of the.. read more
Hampshire NMIS MBU Phases 3 and 8 – Portsmouth.
The M3, A (3)M and A27 represent a critical part of the countries highway network connecting not only the cities of Southampton and Portsmouth to London but also their busy ports. Improving driver information to reduce both congestion and the accident rate was therefore viewed by the Highways Agency to be of strategic importance.
The works main comprised of new electronic message signs, CCTV cameras and Emergency Response Telephones, along with all associated infrastructure. The new message signs were able to show pictures as well as text providing road users with enhanced information about road conditions ahead with the traffic detection system deployed updating the information by monitoring traffic levels and speeds.
Geoffrey Osborne Ltd were the main contractors with overall responsibility for managing the scheme, with McCann’s acting as their principal supply chain partner, installing all of the communication systems infrastructure and a significant proportion of the associated civils works.